Customization: | Available |
---|---|
After-sales Service: | Installation Instruction |
Warranty: | 6months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1. Noise Insulation
Cast Iron is Know for quiet operation. Studies done by the Cast Iron Soil Pipe Institute have shown that cast iron soil pipe and fittings, because of their densemolecular structure and rubber gasket joints, are 750 percent more effective in reducing plumbing noise than substitute materials.
Dinggin drain pipe systems achieve sound values which are well below the maximum sound level of 30dB(A) for third-party rooms.
2. Corrosion Resistance
Cast Iron has, for hundreds of years, been the preferred piping material throughout the world, for drain, waste, and vent plumbing applications and water distribution. Gray iron can be cast into pipe at low cost and has excellent strength properties. Unique corrosion resistance characteristics make cast iron soil pipe ideally suited for plumbing applications.
3. Fire Performance
In drainage installations, safety in case of fire is the primary health and safety concern, both in term of material properties and reaction in fire, and fire resistance to prevent collapse.
Cat Iron is non-combustible and therefore does not propagate fire nore emit toxic gases, unlike plastics-based systems. Consequently, installed cast iron components do not require costly fire protection measures.
1. Are you manufacturer or Trading company?
A: We are professional manufacturer for cast iron pipes and fittings. meanwhile we have more than 12 years export experience.
we know all the trade terms and policy very well.
2. Do you have certification?
A: Yes, all the pipes and fittings get CSA and UPC certificate
3. What is the MOQ for each order?
A: Both small qty for project and large qty for distribution are accepted.
4. How long production time for one order?
A: It depends on order qty. normally for cast iron pipes, it will take about 2-3weeks, for cast iron fittings,it will take 4-6 weeks.
5. What trade terms you supply?
A: FOB, CIF to Vancouver Port, Toronto Port etc
6. What is the payment terms?
A: By TT, 30% deposit, balance paid before delivery.
Contact Person: | Ms.Kelly Sun |
Position: | Senior Sales Manager |
Welcome to enquiry me, we will reply you within 30mins in working time.